Alternative content

Get Adobe Flash player

 
  Version Française        
 
                             
     
 
 
Turnkey Projects
 

Hydraulic work, electrical work, subcontractor coordination, interface management, etc.

 

INSTALLATION EXAMPLE

Installation example - Turnkey project (Click on image to zoom)
Click on image to zoom

Installation example
Installation example

Prior to any treatment, effluents are filtered, neutralized (pH and conductivity adjustment) and then undergo static deoiling.

 

Preparation of effluents prior to treatment   Treatment by Solvin� electrocoagulation   Treatment by vacuum evaporation (MVC)
Preparation of effluents prior to treatment   Treatment by Solvin® electrocoagulation   Treatment by vacuum evaporation (MVC)
 
Crude Effluent   Effluent after treatment by Solvin� electrocoagulation   Effluent after treatment by vacuum evaporation (MVC)
Crude Effluent   Effluent after treatment
by Solvin® electrocoagulation
  Effluent after treatment
by vacuum evaporation (MVC)

 

DISCHARGE INTO PURIFICATION PLANT

 

le rejet en milieu naturel ou recyclage